Sheet metal
Cutting and punching times, sheets required, bending time, press force, and welding time.
In short: Sheet metal
The sheet metal calculators estimate the cutting time of laser, waterjet, plasma and flame cutting and of punching, including the sheets required, the bending time and required press force on a press brake, and the welding time of an assembly from its weld volume. Feed rates, pierce, handling and setup times and deposition rates are starting values per process and material. The cutting tables and times of your own machines remain decisive.
Frequently asked questions about Sheet metal
How do you calculate the laser cutting time of a sheet metal part?
The pure cutting time is the cut length of all contours divided by the cutting feed. Each contour adds piercing, lead-in and travel, each part its unloading, and each batch setup and sheet changes. A rectangular 200 × 100 mm part with four Ø 10 mm holes has about 726 mm of cut length; at 5 m/min, the starting value for 3 mm mild steel, that is about 8.7 s of pure cutting time, plus five pierces of 0.8 s each.
How much press force does press brake bending need?
For air bending, F = 1.42 × Rm × s² × L / V applies approximately, with tensile strength Rm in N/mm², sheet thickness s, bend length L and die opening V in mm; F results in N. The die opening is usually 6 to 10 times the sheet thickness. A 1 m bend in 3 mm mild steel with Rm = 420 N/mm² over V = 24 mm needs about 224 kN.
How is the bending time on a press brake estimated?
Each bend costs the press stroke plus repositioning the part, which takes longer for large parts; setup occurs once per tool set and batch. With the calculator's starting values, 10 s per bend and 6 s of handling for parts up to 300 mm, a part with two bends takes 32 s. 15 min of setup for one tool set spread over 100 parts adds 9 s per part.
How long does a weld take?
The arc time follows from the weld volume and the deposition rate. A fillet weld with throat thickness a has a geometric cross-section of a², about 1.2 × a² with reinforcement. One metre of fillet weld with a = 4 mm in steel thus holds 19.2 cm³ or 0.15 kg of weld metal; at a deposition rate of 3.5 kg/h (MAG) that is about 2.6 min. Tacking, fit-up, handling and seam cleaning often take longer than the weld itself.